Ferrier Point
Smoke Control Systems have worked closely with the Electrical contractor to Supply , Install and Commision an Addressable control system for 44 AOV vents |
![]() |
Smoke Control Systems have worked closely with the Electrical contractor to Supply , Install and Commision an Addressable control system for 44 AOV vents |
![]() |
This was a small development of nine self contained flats which provided a problem to be solved. The requirement for an automatically opening ventilator at the head of the stair was originally missed in the construction of the building meaning of course that a specific design would be required to fit an appropriate alternative system into limited space and within a limited time frame. Utilising expert knowledge and years of experience, a forced extraction system was designed and subsequently approved through building control as an appropriate alternative. |
![]() |
For the Royal College of Art London we were asked to provide a solution to give maximum ventilation to a series of windows and restrict the opening of them to 85 deg, by making a modification to our standard control systems we were able to achieve the customers requirements. |
![]() |
We provided the controls to this highly prestigious apartment building at Lincoln's Inn Fields WC2 to help meet the very short schedule required by the M + E contractor. |
![]() |